Later bounded Engineering Gate exact-head record.
Bounded CP1 engineering evidence.
This page records the specific reviewed engineering scope and its limitations. It is not a production-readiness, compliance, certification, security-certification, or whole-product validation claim.
Recorded in that same bounded Engineering Gate run.
Within the defined Engineering Gate review scope.
Closed within its original Windows evidence review scope.
Engineering Gate record
The later bounded Engineering Gate record is tied to exact-head commit 83ee65b2fe20dc6e9d35f89ebb3f2560f051de7c. The record reports 155 tests, 0 failures, and closure of four identified findings within that review scope.
L-01 disposition
The separate L-01 Windows execution/UI evidence item was formally closed by the outside engineering reviewer within its original bounded review scope. The evidence chain was tied to build FB15-20260806-ENGINEERING-CORRECTION-RC, with verification, launch, stop, and restart evidence attributed to the same verified build and no source substitution or modification across that sequence.
What this does not establish
Public evidence references
The bounded engineering record is summarized on this public page. The underlying repository source records remain in Fieldborne's controlled engineering repository and are not represented here as publicly accessible links.
- Engineering Gate exact-head:
83ee65b2fe20dc6e9d35f89ebb3f2560f051de7c - Windows evidence build:
FB15-20260806-ENGINEERING-CORRECTION-RC - Bounded disposition: four identified Engineering Gate findings closed; L-01 closed within its original bounded review scope.
Next engineering sequence
CP2 review, CP1↔CP2 integration, product overlay, and final product acceptance remain separate bounded gates before launch.